Vrancea
- Project type: BESS, PV
Project details
- Size: 6.3 MW
- Co-located BESS: 2 MW
- Estimated Annual Production: 8.12 GWh/year
- Grid connection approval (ATR): Yes
- Connection type: Existing power station
- Voltage: 20 kV
- Distance to connection point: 0 km
- Permitting status: Complete
- RTB estimate: Complete