Timis
- Project type: BESS, PV
Project details
- Size: 50 MW
- Co-located BESS: 41 MW
- Estimated Annual Production: 62.25 GWh/year
- Grid connection approval (ATR): Yes
- Connection type: Existing power station
- Voltage: 110 kV
- Distance to connection point: 19 km
- Permitting status: 90%
- RTB estimate: Q4 2024